Quality Control
Site Quality Control
| Construction Phase |
Item |
Remarks |
| Construction Preparation |
Sub-item construction plan and execution |
|
| |
Quality control index inspection frequency and methods |
|
| |
Preparation of materials, machinery, labor, and on-site management personnel |
|
| |
Construction survey and layout report |
|
| |
Standard test report |
|
| |
Design and construction review |
|
| Sub-item Start Report |
|
|
| |
Not approved |
Analyze the reason, timely modify, recheck or rework |
| |
Approved |
Sub-item start approval form |
| Each Process Construction |
Material inspection |
Self-inspection results |
| |
Process flow inspection |
|
| |
Measurement inspection |
|
| |
Test inspection |
|
| |
Quality engineer inspection |
|
| |
Qualified |
Proceed to next process |
| |
Not qualified |
Analyze the reason, timely modify, recheck or rework |
| Process Handover Report |
Sampling inspection |
|
| |
Data inspection |
|
| |
Test sampling |
|
| |
Measurement inspection |
|
| |
Process inspection record check |
|
| Completion Report |
|
|
| |
Qualified |
Completion certificate |
| |
Not qualified |
Analyze the reason, timely modify, recheck or rework |
Certifications
Standard:
CE
Number:
Scope/Range:
AGV/unmanned forklift body manufacturing
Issued By:
Standard:
CQC
Number:
Issue Date:
2023-10-17
Expiry Date:
2026-10-16
Scope/Range:
AGV/unmanned forklift body manufacturing
Issued By:
Standard:
14001
Number:
Scope/Range:
Issued By:
Company Profile
Guangzhou Tianyue Automation Technology Co., Ltd.
Contact Person: MrLiang